New to Tortech!
- It is a three phase metering unit. three phase metering unit for renewable energy applications
- It is rated at 22kv and 100A per phase.
- It is a pole mounting 3 phase unit.
- It is epoxy cast not oil filled.
- It is half the weight and half the volume of an equivalent oil filled 3 phase metering unit.